PHOTO GALLERY:![]() |
Wastewater Treatment Plant (WWTP) Constructed at its current location (401 Alexander) in 1973, with substantial upgrades in 1998 and 1999, the plant serves as the main Wastewater Division Office. |
![]() |
Oxidation Ditch |
![]() |
Inspecting Sewer Lines with Closed Circuit Television (CCTV) Equipment |
![]() |
CCTV Tracker and Camera |
![]() |
Pressing Biosolids using a Roediger Belt Filter Press |
![]() |
Cleaning Sewer Lines |
![]() |
WWTP Main Entrance |
![]() |
Loading Biosolids in Trailer bound for Boulder Park, Inc. |
Product Removed from a Plugged Pump Reminder: Please do not flush baby wipes or other cleaning wipes |
|
Hycor Mechanical Screen | |
1.5 MGD Lakeside Oxidation Ditch | |
Amwell Secondary Clarifier | |
![]() |
Headworks Structure |
Sewer Repair in Alley Right-of-Way | |
![]() |
WWTP Crew |
Wastewater